Search: News Price
Home |  Register |  Price Index  |  Publication |  Consultancy |  Data |  Events |  Enquiry |  Language
May.05.2024 1USD=7.1063RMB
  SteelHome >>Nonferrous Metals>>Market Info>>International Dynamics
 
Anglo American Announced 2020 Q1 Nonferrous Production Report

https://en.steelhome.com [SteelHome] 2020-04-26 15:50:34

share to social network site

COPPER

Copper production decreased by 9% to 147,100 tonnes, largely due to an expected reduction at Los Bronces, driven by the continued drought conditions in central Chile,  partially  offset by  continued strong  plant performance at Collahuasi.

Production from Los Bronces decreased by 25%, to 68,700 tonnes with a 42% reduction in plant throughput (7 million tonnes vs 12 million tonnes) due to lower water availability, partially offset by planned higher grades (1.0% vs 0.8%). Chile′s central zone continues to face unprecedented climate conditions, with this drought being the longest since records began.

At Collahuasi, attributable production increased by 16% to 66,500 tonnes driven by higher plant throughput (14 million tonnes vs 13 million tonnes) and higher copper recovery (89.1% vs 86.3%), due to plant optimisations and improvements implemented during 2019, as well as planned higher grades (1.20% vs 1.16%).

Full Year Guidance

Production guidance for the year is unchanged at 620,000-670,000, subject to water availability and the extent of further COVID-19-related disruptions.

Table 1: Copper Production Overview

Copper (tonnes)

Q1 2020

Q1 2019

Q1 2020 vs. Q1 2019

Q4 2019

Q1 2020 vs. Q4 2019

Los Bronces

68700

91700

-25%

71700

-4%

Collahuasi (44% share)

66500

57300

16%

72200

-8%

El Soldado

11900

12100

-2%

14900

-20%

Total Copper

147100

161100

-9%

158800

-7%

 Table 2: Copper Production by Mines

 

Q1 2020

Q4 2019

Q3 2019

Q2 2019

Q1 2019

Q1 2020 vs. Q1 2019

Q1 2020 vs. Q4 2019

Los Bronces mine

 

 

 

 

 

 

 

Ore mined

10013000

17373800

15560400

17302500

15678600

-36%

-42%

Ore processed - Sulphide

7059500

7146800

10977200

11813600

12070800

-42%

-1%

Ore grade processed - Sulphide (% TCu)

0.98

0.99

0.78

0.81

0.8

22%

-1%

Production - Copper cathode

9900

10000

10100

9300

9600

3%

-1%

Production - Copper in concentrate

58800

61700

70300

81900

82100

-28%

-5%

Total production

68700

71700

80400

91200

91700

-25%

-4%

Collahuasi 100% basis (Anglo American share 44%)

 

 

 

 

 

 

 

Ore mined

19402000

22132200

25780000

23698300

15642800

24%

-12%

Ore processed - Sulphide

14097800

14728700

14478700

11626100

13299600

6%

-4%

Ore grade processed - Sulphide (% Tcu

1.2

1.25

1.14

1.21

1.16

4%

-4%

Production – Copper in concentrate

151000

164200

146600

124400

130200

16%

-8%

Anglo American’s share of copper production for Collahuasi

66500

72200

64500

54700

57300

16%

-8%

El Soldado mine

 

 

 

 

 

 

 

Ore mined

1915300

2721400

3299900

3017800

3089000

-38%

-30%

Ore processed – Sulphide

1458900

1854900

1911700

1861900

1809900

-19%

-21%

Ore grade processed - Sulphide (% Tcu)

1.02

1.02

0.92

0.92

0.84

21%

0%

Production – Copper in concentrate

11900

14900

14000

13200

12100

-2%

-20%

Chagres Smelter

 

 

 

 

 

 

 

Ore smelted

30800

30800

28800

32100

30300

2%

0%

Production

30000

29900

28000

31200

29500

2%

0%

Total copper production

147100

158800

158900

159100

161100

-9%

-7%

Total payable copper production

141700

153100

153000

153100

155000

-9%

-7%

Total sales volumes

139600

176500

160000

165400

141900

-2%

-21%

Total payable sales volumes

134300

170100

153800

159100

136500

-2%

-21%

Third party sales

76300

115300

91600

88800

53400

43%

-34%

NICKEL

Nickel production increased by 11%, benefiting from improved operational stability and the effect of a planned stoppage at Barro Alto that began in late Q1 2019.

Full Year Guidance

Production guidance is unchanged at 42,000-44,000 tonnes, subject to the extent of further COVID-19-related disruptions.

Table 3: Nickel Production Overview

Nickel (tonnes)

Q1 2020

Q1 2019

Q1 2020 vs. Q1 2019

Q4 2019

Q1 2020 vs. Q4 2019

Nickel

10900

9800

11%

11700

-7%

Table 4: Nickel Production by Mines

 

Q1 2020

Q4 2019

Q3 2019

Q2 2019

Q1 2019

Q1 2020 vs. Q1 2019

Q1 2020 vs. Q4 2019

Barro Alto

 

 

 

 

 

 

 

Ore mined

318000

623300

1198800

1365400

888000

-64%

-49%

Ore processed

610100

609200

612000

519000

525400

16%

0%

Ore grade processed - %Ni

1.57

1.73

1.66

1.67

1.67

-6%

-9%

Production

8700

9500

9200

7600

7700

13%

-8%

Codemin

 

 

 

 

 

 

 

Ore mined

1300

39000

n/a

n/a

Ore processed

145800

141600

140200

148900

139900

4%

3%

Ore grade processed - %Ni

1.62

1.68

1.69

1.62

1.62

0%

-4%

Production

2200

2200

2100

2300

2100

5%

0%

Total Nickel production

10900

11700

11300

9800

9800

11%

-7%

Sales volumes

10600

12500

10600

8800

9800

8%

-15%

Source: Anglo American


(To contact the reporter on this story: jemma.shang@steelhome.cn or 86-555-2238875 18155520624)
Related News
上海市通信管理局
沪B2-20040629
Copyright© 2004-. SteelHome.com. All Rights Reserved
Shanghai SteelHome Information Technology Co., Ltd    Tel: +86) 021-50585733, 50585358    Fax: 021-50585277